The last week has seen a dramatic change to the inside of the building with the laying of the power floated floor. An amazing process to watch with the concrete being pumped into place by a huge crane/pump, the concrete positioned and tamped by a team of welly wearing workers, and the finish achieved by the use of 3 different bladed machines.
We should see the completion of the cladding by the end of the week and some shutter doors next week. Keep checking in for the progress reports.